From Construction Site to Finished Lake Home



Designing Around the Landscape

In total, 96 yards of soil were brought in to complete the rough and final grading.
Of those 96 yards, 64 yards were used for rough grading. This allowed the team to raise the grade around the home and establish a slight slope away from the house to help direct water away from the foundation. The areas outside of the retaining walls also had to be reshaped to allow water to drain properly without causing erosion down the hillside.
The remaining 32 yards consisted of screened topsoil used for the final grade. This created a smooth, finished surface and provided the quality soil base needed to encourage proper sod establishment and healthy lawn growth.

A Lawn They Could Enjoy Right Away

Keeping the Property Green

Finishing the Details

The Right Team for the Vision

